top of page

%202.png)
3 Building, Class A Logistics Center
Ability to reach 75% of the state’s population within a 3-hour drive
Highly strategic location in the middle of the “Texas Triangle”
Access to dense labor supply and rapidly growing population in the region

I-35 Frontage
State and local
incentives available
Strong existing
corporate presence
Limited Class A industrial availability
in the region
Phase 1 Ground Breaking Q4 2022 Phase 1 Delivering Q4 2023 Phase 2 Ground Breaking TBD
bottom of page